Specifications include, but are not limited to: The work involves the disconnection and abandonment of the existing 6” sanitary sewer main and the 3” domestic water service serving Burr Hall. Work includes the installation of a new 6” sanitary sewer main and new 4” domestic water service serving Burr Hall on the campus of Eastern Connecticut State University. Summary of Work includes but is not limited to the following: 1. Disconnection and Abandonment of the existing 3” galvanized domestic water service. 2. Installation of new 4” cement-lined ductile iron water service and water service riser within the building. 3. Connection to 6” water main along Windham Street and coordination of the work with water utility (Windham Water Works). 4. Disconnection and Abandonment of the existing Sanitary Sewer service. 5. Installation of new 6” Sanitary Sewer service from utility to building and within building connecting to existing waste. 6. All trenching, excavation & backfilling required both exterior and interior to the building. 7. Site Restoration of disturbed areas. 8. Coordination with local water utility & water pollution control authority. 9. Trenching/Backfilling along with site work & protections for the installation of a new underground services to Burr Hall. 10. Modifications to the existing underground 6” water utility main run along Windam Street.