Specifications include, but are not limited to: Removal of Debris and Site Maintenance 1. The contractor shall include in their bid the cost of trash containers and the removal and lawful disposal of said debris off site as required. 2. The Contractor shall coordinate with the Owner for the placement of trash containers if necessary prior to the start of the proposed work. 3. The Contractor shall be responsible for the daily clean up and maintenance of the site. All debris, construction materials, scrap, rubbish etc. shall be placed in a trash container or dumpster on a daily basis. Sidewalks, driveways and pedestrian ways shall be clean and free of debris at the end of each day. 4. The Owner shall not place anything in the dumpster without prior approval from the Contractor.