The project consists of fit-up construction for the relocation of 5-tenants at the White Hall Classroom Building to other buildings located on the University of Kentucky campus in Lexington, KY: 1. GIS (Geographic Information Science) Classrooms (2) to be fit-up in W.T Young Library basement. 2. RICOH Printing Service to be fit-up in Blazer Hall. 3. Mathskeller Math Resource Center, Wildcat Wardrobe Clothing Service and United States Post Office to be fit-up in Patterson Office Tower mezzanine The existing furnishings and equipment of the above tenants will be removed and reinstalled by others. Architectural fit-up work in the various spaces includes selective demolition, metal fabrications, non-structural metal framing & gypsum board, batt insulation, firestopping, sealants, doors / frames / hardware, glazing, interior painting, resilient base, coiling shutter, signage, countertops, etc. Mechanical / Electrical fit-up work includes selective demolition, fire suppression sprinkle modifications, HVAC piping / equipment, metal ducts & accessories, testing, instrumentation, adjusting & balancing for HVAC, low-voltage power conductors / cables, conduit, boxes, wiring devices, fuses, switches, access control, security / safety / video surveillance, etc..