Specifications include, but are not limited to: Demolition Work: 1.1.1. Remove 100% of the fill in the cells of Towers 1 and 2 and place in Contractor supplied dumpsters for removal. Contractor is responsible for all debris removal. 1.1.2. With fill removed, mechanically prepare the leaking end walls to a SSPC-SP-10 or NACE No. 2 (see Exhibit D Near White Blast surface finish to achieve a minimum 3mil surface profile and coat with CIM Industries 1061 (or equal) two component elastomeric urethane coating to a thickness of 60 wet mils. 1.1.3. Supply and install new Brentwood Industries bottom supported heavy duty XF75 15mil fill Packs (or equal). To include the following: 1.1.3.1.XF 75 15 mil. Thickness after forming packs with integrated louvers and integrated drift eliminators. 1.1.3.2.Fill material installed at 64” of air travel to match the existing air travel. 1.1.3.3.New FRP corrosion resistant fill supports. FRP must be either Strongwell Corporation or Bedford Reinforced Plastics. 1.1.3.4.New FRP/PVC/Neoprene corrosion resistant air and water seals. 1.1.4. Remove and replace mechanical components in both cells to include the following: 1.1.4.1.Two (2) new BAC fans selected BAC HP7i composite/fiberglass airfoil blade to meet or exceed the original OEM, including all new hub housing. 1.1.4.2.Two (2) new OEM BAC gear reducers. 1.1.4.3.New OEM BAC rubber bonded drive bushings in both cells. 1.1.4.4.New OEM BAC drive shafts and yokes. 1.1.5. Re-seal the HWBs, distribution boxes and distribution troughs in both cells to include the following: 1.1.5.1.Disassembly of the distribution boxes and distribution troughs, remove old sealant, clean, apply new sealant and reassemble...