(10th St) /Hughes Street Upgrades (Baker City) Project on the La Grande - Baker Highway (Rt. No. US30) in Baker City. FAP No. S066(023). ($ 5,000,000 - $ 10,000,000). Req. approx. 1,800 ft2 temp. signs; 4 ea. PCMS; 1,660 hr. flaggers; 3 ea. AFAD; 1,560 ft. ped. chan. dev.; 1 ea. decom. reg. UST; 1,600 ton contam. soil disp.; const. surv. work; 11,160 yd2 rem. of surf. for curb ramp const.; 13,770 ft asph. pvmt sawcut.; 2,400 yd3 gen. exc.; 725 yd2 subg. stab.; 802 ft storm sewer pipe; 2,366 ft DI pipe; 30 ea. conc. MH; 79 ea. conc. inlets; 507 yd2 trench resurf.; 68 ft2 prefab. mod. retain. wall; 10,180 yd2 CPPR; 7,660 ton aggr. base; 3,770 ton ACP; 28,200 ft2 asph. slp. paving; 9,105 ft conc. curbs; 2,000 ft2 conc. islands; 17,300 ft2 conc. drvwy.; 44,010 ft2 conc. walks; 102 ea. curb ramps; 1,407 ft2 trunc. domes; 34,000 ft paint pvmt. mark.; 850 ft2 pvmt. legend; 839 ft2 signs; 1 ea. traf. sig. mod.; 2 ea. flashing beacon install; 163 ton rock mulch; 293 ft CL fence. Completion Time: October 31, 2025. Classes of Work: Either: A) Earthwork and Drainage, or B) Miscellaneous Highway Appurtenances