Specifications include, but are not limited to: The work generally consists of the following: Restoration - 1 LS, Traffic Control - 1 LS, Erosion and Dust Control - 1 LS, Pavement Sawing – 417 LF, Milling Pavement - 30 SY, Pavement Removal, Excavation & Grading – 3,250 CY, Excavation Below Subgrade - 254 CY, Remove Concrete Curb & Gutter - 951 LF, Remove Concrete Sidewalk - 218 SY, Remove Driveway Pavement - 101 SY, Dense Graded Base (1-1/4”) - 5,004 TON, Dense Graded Base (3”) - 585 TON, Dense Graded Base (3/4”) - 84 TON, 30” Concrete Curb & Gutter – 1,037 LF, Pedestrian Curb – 43, 5” Concrete Sidewalk - 2,054 SF, 7” Concrete Driveway - 94 SY, 8” Concrete Pavement - 19 SY, Curb Ramp Detectable Warning Field - 117 SF, Bit. Concrete Surface (5 LT 58-28 S) - 912 TON, Bit. Concrete Binder (3 LT 58-28 S) - 1,600 TON, Manhole Adjustments - 11 EA, Valve Adjustments - 14 EA, 6” Gate Valve & Box - 2 EA, 6” PVC Water Main (Granular Backfill) - 55 LF, 8” Gate Valve & Box - 9 EA, 8” Insertion Valve & Box - 1 EA, 8” PVC Water Main (Granular Backfill) - 1,849 LF, Hydrant – 2 EA, 1.00” Copper Water Service – 301 LF, 2.00” Copper Water Service – 5 LF, Connections to Existing Water Main – 8 EA, Water Main Abandonment – 1 LS, Pavement Marking Epoxy White 6 inch – 505 LF, Pavement Marking Stop Line 18 inch – 191 LF, Pavement Marking Epoxy White 24 inch – 342 LF