Specifications include, but are not limited to: The City of Miramar is soliciting bids from qualified responders to furnish all material, equipment, labor, and any incidentals needed to complete the project. Complete removal all invasive trees which includes Australian Pine, Brazilian Peppers, etc. to include tree stumps in and around the conveyance drainage swale and fence line. All drainage structures to be located, cleaned, and protected. Dry retention areas to be cleared and re-established to function in accordance with the original permit, all drainage culverts to be inspected and cleaned as necessary, control structures to be inspected, and any required maintenance work should be performed. Install concrete apron around catch basins where necessary