This project is installing a new UG distribution line service on the Lower MG line located near the intersection of North Fork Rd with Highway 22 near Mehama, OR. After fires devastated the region in the summer of 2020, substantial power distribution infrastructure restoration has begun. The work starts along Highway 22 21.9 miles east of I-5 from Salem, OR. The below map shows the location as well as coordinates below the map. The scope of the work includes trenching/boring and installing 106 pad-mount transformer sleeves, 51 junction box sleeves, and 31 secondary pedestals. Each of these pieces of equipment will have GE fiber splice boxes (186) installed next to the equipment. Each 1-Phase trench will contain 1 3” conduit and 1 2” conduit. Each 3-Phase trench will contain 3 3” conduits and 1 2” conduit. This project will also include attaching 3 3” and 1 2” conduit to the bridge on Pioneer Road. Detailed specifications can be found in Exhibit 6 Issued for Bid (IFB).