Specifications include, but are not limited to: The following preliminary scope of work items are anticipated for the proposed project and provided for information and are not required SOQ submittals. A. ADA/PROWAG Ramps, Approaches, Alleys, Sidewalk, and Curb and Gutter 1. Provide the design and construction of new ADA/PROWAG compliant ramps, approaches, midblock sidewalk. 2. Replace approximately 80 new ADA/PROWAG compliant ramps; replace 40 approaches, replace 2 approaches with full height curb and sidewalk; replace approximately 2700 SQYD of midblock sidewalk; replace or add approximately 1650 linear feet of Curb and Gutter. These are estimated quantities. Scope of work is subject to change in the RFP. 3. Quantities given herein shall not be used for additional compensation if quantities overrun due to required tapers/tie-ins to meet ADA requirements and/or constructability purposes. It is the Firms responsibility to estimate construction quantities during the proposal phase and bid accordingly. 4. A minimum of 4-inch concrete must be used for mid-block sidewalk, 6-inch concrete must be used for approaches and ramps where truck off-tracking is likely. 5. Return any landscaped areas and underground sprinklers disturbed by construction to their original condition. 6. Paint new curb areas where existing curb is currently painted. 7. Dispose of all materials generated by the project in accordance with all State and City regulations.