Specifications include, but are not limited to: A. Single Family Housing Development a. The successful bidder shall be responsible for the turn-key construction of SingleFamily Housing Development and Public Facilities Improvements located at Parcel #L001 293 (211 7th Street) and #L001 117 (208 E Eighth Street), Louisville, GA. The proposed developments shall consist of three Single-Family home. i. Two homes will be constructed using Connor House plan and one home will be constructed using the Kelly Plan. b. The successful bidder shall provide all furniture, fixtures, and equipment as shown on the architectural plans. c. The project must meet all requirements of the International Building Code and the Georgia Accessibility Code. This construction shall be completed in accordance with local building codes, written specifications, and design drawings. d. Georgia Law requires Single-Family affordable housing projects awarded state or federal funds and constructed for individuals and families of low and very-low incomes be constructed to be accessible (O.C.G.A. §8-3-172). Successful bidder must agree to adhere to “Visitability” requirements as defined in the bid packet. e. Each of the homes constructed will meet energy-standards such as Earth Craft™, Georgia Power Good Cents Home™, or other similar standards applicable to the style or type of construction, to the greatest extent possible. f. All Universal Design Features must be completed as per architectural plans. B. Site Preparation and Grading a. The city of Louisville will assist with sitework prep. The city will supply the following: • 1,260 cubic yards of dirt to be hauled / 18 CY trucks = 70 loads of dirt • 70 loads dirt/1 hour per trip = 70 hours /2 truck = 35 trips per dump truck • 70 hour / 2 trucks = 35 hours / 2 = 17.5 each for excavator and wheel loader working together to load trucks at dirt pit. The successful bidder shall be responsible for overseeing the sitework. Sitework shall include, but is not limited to, tree removal, grading, concrete driveway, soil erosion and sedimentation control, water control, and all utility connections. The successful bidder shall be responsible for ensuring all proper construction standards are met including providing proper compaction of soil, aggregate, and pavement. b. The successful bidder shall ensure that site preparation and grading meet all applicable local, state, and federal soil erosion and sedimentation control requirements and storm water requirements. This construction shall be completed in accordance with local building codes, written specifications, and design drawings. c. The successful bidder shall ensure that the front lawn is laid with sod and the back lawn is grassed and seeded. d. The successful bidder shall provide all labor, tools, and equipment to complete all site development as detailed in the site plans. e. The successful bidder shall provide a detailed pricing allowance for the houses, infrastructure, and site development.