Specifications include, but are not limited to: 1) The Contractor shall provide and install new storefront windows and one new operable cashier window, one LED overhead light fixture, new support columns with Hardie board siding and trim, and one new mini-split HVAC unit (sized by Contractor) on the ticket booth. All windows shall be double-pane, argon-filled, Low E glass. 2) The Contractor shall provide and install 40 new hanging, 3000K LED barn style light fixtures and four new LED sconces to replace existing. 3) The Contractor shall provide and install Hardie board to wrap six external columns on pool house and shelter. 4) The Contractor shall provide and install seven new toilets (two of which are ADA), three new urinals, twelve new sinks (four of which are ADA), and eight new shower controls (remove one shower to combine for one ADA shower stall in women’s; one ADA shower in both men’s and women’s showers). Contractor shall provide and install ADA grab bars and toilet paper dispensers (matching park supplier specifications). Note: One toilet on each side will be removed/patched and space combined to meet ADA requirements. 5) The Contractor shall clean, prep, and paint two coats on all post and beam, tongue and groove roof decking, vented openings, doors, rafters, entire exterior of pool house except for stonework, all non-tile interior walls, pool light poles, and accompanying picnic shelter. All exposed electrical conduit shall be painted as well. 6) The Contractor shall provide and install eight new exterior doors (4 single, 3 double doors and 1 large double door) with commercial metal doors. Doors shall have locking lever style exterior door handles with BEST ACCESS locks, interior panic bars, and door closer. 7) The Contractor shall provide and install all new toilet partitions to replace existing partitions. 8) The Contractor shall provide and install all new insulated PEX piping with manifold controls in each bathroom and staff room and system drain ports to allow for proper winterization. Piping will require supports as needed. 9) The Contractor shall provide and install new electrical wiring throughout the pool house and ticket booth to include replacing all six electrical sub-panel boards. All work must meet applicable electrical and other code requirements. 10) The Contractor shall provide and install two new exterior bottle fill wall mounts to replace existing water fountains. 11) The Contractor shall provide and install five new wall exhaust fans, evenly spaced above 8-feet on concrete block back walls and connect to power. 12) The Contractor shall provide and install four new electric hand dryers to replace existing. 13) The Contractor shall provide and install new metal-wrapped fascia and trim to replace existing on upper roof line