Specifications include, but are not limited to: Albion Middle School (1): CAT6 Cabling: 5 drops and 1 48 port CAT6A patch panel. All cabling will be terminated at the newly requested patch panel in the closest communication closet. Also, cabling is terminated at the work area with a surface mount box (biscuit) in the ceiling of specified rooms near projector with appropriate service loop. All copper horizontal cabling shall have slack service loops no less than 12” at the work area (equipment outlet). Alta High School (2): CAT6A Cabling: 2 drops and 1 48 port CAT6A patch panel. All cabling will be terminated at the newly requested patch panel in the closest communication closet. Also, cabling is terminated at the work area with a surface mount box (biscuit) in the ceiling of specified rooms near projector with appropriate service loop. All copper horizontal cabling shall have slack service loops no less than 12” at the work area (equipment outlet). Altara Elementary School (3): CAT6 Cabling: 46 drops and 1 48 port CAT6A patch panels. All cabling will be terminated at the newly requested patch panel in the closest communication closet. Also, cabling is terminated at the work area with a surface mount box (biscuit) in the ceiling of specified rooms near projector with appropriate service loop. All copper horizontal cabling shall have slack service loops no less than 12” at the work area (equipment outlet)...