Specifications include, but are not limited to: Contractor shall provide onsite service support (2) days per month (Once every 2 weeks) during the contract period 8:00 am to 5.00 pm Monday thru Friday. The Contractor shall provide qualified technicians employed directly by the contractor (Computrols) to work with Key Facility Management Staff on BMS tune up, maintenance, calibration, updating, and developing energy conservation control measures and strategies within the BMS, associated equipment and related Building System Energy (BSE) controlled by BMS. Contractor shall provide tune-up, calibration and maintenance to include an analysis of the Chiller plant control system, HVAC Control system, as well as applicable building control technologies related to SAWS Facilities. Contractor shall update and correct deficiencies within the existing BMS system and BSE, to increase the energy efficiency of the facility through maintenance of the BSE and BMS to provide options and alternatives that may improve the overall BMS (equipment calibration, system modifications, etc.) during the process. The Contractor shall work with the facility operators, technicians and energy engineer to develop strategies, schedules, setbacks, calibrations, and adjustments associated with the energy utility systems and will make ready for system transfer to the new upgrade. The contractor will also update graphics for each major change to the building or BSE that is made through renovations, editions or equipment replacement if it is not part of the project contract...