Specifications include, but are not limited to: • Reconstructing the roadway with a new insulated roadway structural section and installing high/low spots in the roadway profile as shown on the Drawings. • Reconstructing the adjacent driveways with a new structural section to match the new roadway profile, at locations as shown on the Drawings. • Removing and replacing the existing sidewalk and pathway along E. Northern Lights Boulevard. • Removing, replacing, and extending the existing storm drain system. Work includes installing new storm drain structures, pipe, and an outfall into South Fork Chester Creek. • Installing a new concrete headwall, fall protection fence, and erosion protection at the new storm drain outfall. • Relocating the water main in E. Northern Lights Boulevard for constructing the new storm drain system. • Removing and replacing the existing Derby Way sewer main within the project limits. • Abandoning two existing storm drain outfalls south of Camrose Drive. Abandoning one storm drain outfall south of E. Northern Lights Boulevard. Abandoning storm drain pipe and a storm drain manhole within E. Northern Lights Boulevard. • Constructing temporary creek diversions and then removing them after installation of new storm drain outfall and abandonment work. • Reconstructing the streambank at the new storm drain outfall and at the storm drain outfall abandonment work areas.