Specifications include, but are not limited to: mobilization, traffic control, and maintenance of traffic; reconstruction of miscellaneous structures to grade; all required earthwork; reconstruction of disturbed curb and gutter, sidewalks, driveway approaches, ADA access ramps; demolition of miscellaneous storm drain infrastructure; installation of storm drain pipe and structures; removal and disposal of existing storm drain infrastructure; removal and disposal of existing pavement; placing, compacting and grading new asphalt surface course; placing new curb, gutter, and sidewalks; abandonment of existing storm drain pipes; and all appurtenant work; all in accordance with Drawings and Specifications prepared by the ENGINEER.