1. Permits and Mobilization, Demobilization 2. Erosion Control 3. Water Management and Turbidity Reduction 4. Borehole Drilling – 12-Inch 5. Borehold Drilling – 10-Inch 6. Drive Shoe 7. Well Casing 8. Open-Hole Video Logging of Basalt Encountered 9. Well Screen and Filter Pack Design 10. Well Screen Assembly 11. Filter Pack. 12. Well Surface Seal 13. Additional Cement Grout 14. Well Development – Dual Isolation with Submersible Pump 15. Well Development - Pumping with Test Pump 16. Plumbness and Alignment Testing 17. Well Disinfection 18. Video Logging of Completed Well 19. Well Surface Completion 20. Aquifer Testing Equipment 21. Furnish, Install, and Remove Discharge Pipe 22. Step-Rate Aquifer Testing and Recovery Monitoring 23. Constant Rate Aquifer Testing and Recovery Monitoring 24. Refer to Plans and Technical Specifications for other items