Specifications include, but are not limited to: 1. The City will arrange for the disconnection of utility service connections. Before starting demolition the contractor must verify that all utilities have been disconnected. The contractor is responsible for calling dig safe to get locates. 2. The sewer shall be capped. This must be completed by a licensed plumber. 3. Demolish and remove the house and foundation. 4. All demolition materials must be dumped in a demolition landfill licensed by Kansas Department of Health and Environment. 5. Demolition landfill receipts to show landfill usage is required prior to payment for services rendered. 6. Remove concrete, bricks, light fixture, buckets, wooden boards, umbrella, glass, barrels, mirror, miscellaneous household furniture, chairs, limbs, branches and wood on ground, loose trash, debris and rubbish from the premises. 7. Remove all interior sidewalks and cement pads between the City sidewalk and the back of the property. 8. Remove the section of wood privacy fence and metal wire fencing that runs along alley. 9. Leave white fence along front of property. Equipment access should be available via alleyway. 10. All trees, branches and limbs on the ground, incidental to the demolition of the structures. Trees can only be removed if affecting the demolition of the structure. (Include any tree removal necessary with the bid of the structure) **NOTE if a tree in the City ROW needs to be removed the contractor is responsible for contacting the Code Inspector prior to the removal of the tree. 11. All grass/vegetation shall be cut back below the 12 inches to comply with the City of Topeka ordinance. 12. The foundation hole must be inspected to insure no demolition debris is in it prior to back filing of the excavation. 13. The site must be graded to drain away any standing water or drainage way and the ground shall be grass seed ready.