Specifications include, but are not limited to: upgrade the existing electronic detention system at Lakes Crossing per plans and specifications. Upgrades include installation of an access control system, card readers and card printer; installation of additional CCTV cameras; removal and replacement of CCTV recording servers and viewing workstations/monitors; installation of additional intercoms; removal and replacement of existing PLC HMI computer; HMI software upgrades and new programming to accommodate added security devices; installation of new enclosure and cooling system for electronic detention system equipment racks; modify existing storage room into a new camera viewing control room connected to the existing PLC system; architectural, lighting and HVAC revisions to accommodate control room and equipment room upgrades.