Specifications include, but are not limited to: This work shall be considered part of the DMT Resiliency and Flood Mitigation project; the Sea Curb work includes selective demolition, removal, and salvage of existing features and components of DMT Berths 1—13 and adjacent areas, and construction of flood and storm surge resistant barrier structures, including both immovable (fixed) concrete systems and a variety of moveable (removable and deployable) systems. The demolition, removal, and salvage work includes: removal and disposal of cast steel cleats; selective removal and salvage of Fiber Reinforced Plastic (FRP) backing beam and associated components; removal and disposal or reinstallation of various site features and components that would otherwise interfere with immovable and movable barrier systems. New flood barrier construction consists of: slipformed reinforced concrete Sea Curb system; reinforced cast-in-place concrete parapet barrier system; removable barrier systems at vessel ramp opening locations consisting of precast concrete gravity blocks; deployable barrier systems at bollard and other opening locations consisting of hinged steel gate systems. Associated work includes provision of precast and/or cast-in-place concrete foundation elements, earthwork, paving, and scupper-type drainage systems at the fixed barrier systems.