1. The contractor will be responsible for asbestos abatement, removal, and proper disposal of specified contents of existing vacant commercial buildings. The listing of structures to be abated is included as Attachment B. 2. The Asbestos Report and Project Design are available for review on the SanteeLynches website at: https://www.santeelynchescog.org/rfpsbids. 3. The contractor will be responsible for all costs of transport and proper disposal of demolition debris, both Asbestos Containing material and non-Asbestos Containing material. 4. The Contractor will provide a complete compliance history and documentation of site procedures in relation to the abatement and disposal of asbestos and non-asbestos containing materials. 5. The contractor will be responsible for all landfill fees for asbestos containing material. Landfill tickets must be submitted with all invoices in order for payment to be processed. Landfill tickets must clearly show the address and Parcel Number. Demolition for properties must be completed, no partial payment request will be accepted. 6. The contractor will be responsible for obtaining all certifications and permits necessary for the completion of the project from the applicable regulatory agencies. 7. The contractor is responsible for all temporary facilities necessary to successfully complete the project to include, but not limited to, portable restrooms, temporary power, temporary water, silt fencing, site security, etc. 8. Caution and care must be exercised to prevent damage to adjacent structures, and to ensure that existing businesses can operate normally without significant disruption during demolition activities. 9. Caution and care must be taken to ensure mature trees are not removed or damaged. 10. The Contractor must comply with SCDHEC Regulation 61-86.1 – “Standards of Performance for Asbestos Projects”. 11. All required Air Monitoring during asbestos abatement has been contracted separately and is not the responsibility of the contractor retained under this RFB.