Specifications include, but are not limited to: The work includes all materials, equipment, transportation, and labor necessary to complete the improvements. This project consists of a Base Bid and Two (2) Bid Alternatives. The proposed Base Bid project includes 13,919.1 CY class 10 excavation, 305.6 CY of Class 10 Waste, 2937.9 CY of Topsoil Strip Salvage and Place, 51,1132.9 SY Subbase, Soil Aggregate Base, 1240 LF of 6” Subdrain, 2 SW-512 intakes, 1,280 SY of 8” PCC Pavement, 49,943.7 SY of 6” PCC shared use path, 120 SY of 8” PCC shared use path, 1783.3 Tons of Class E Revetment Stone, trail signage, traffic control, erosion control, surface restoration, and other miscellaneous work. Additionally, two alternate bids must be filled in. The First alternate consists of the partial removal of a twin-cell reinforced concrete culvert box and the installation of 94 CY of structural concrete and 12,518 lbs of reinforcing steel in a new cast-in-place twin parallel wing wall and an associated 250 Tons of Class E Revetment Stone and an additional 800 CY of Class 13 Excavation and Waste. The second alternate consists of 6 panels of decorative fence, in place of a chain link fence.