Specifications include, but are not limited to: repair approximately 100 feet of the left bank of Pistol Creek and approximately 275 feet of both banks of Battle Creek flowing through Bicentennial Park in Maryville, TN, as more fully described in the plan documents. Soil and vegetative bioengineering techniques will be used to stabilize existing streambanks including streambank grading, installation of coir fiber matting and stone at the toe of the bank, and native vegetation planting including 50 ball and burlap trees and 67 bare root seedlings. This project also involves the relocation of a section of greenway trail. The bids will consist of a Base Bid, and a Bid Alternative 1. The City of Maryville will choose which bid to proceed with based on available budget.