Specifications include, but are not limited to: A1. Iolehaehae New 3 channel HIWIN P25 EF Johnson trunk site. Installation of all ETS provided EF Johnson P25 Phase 2 Trunking infrastructure equipment within existing communications site facility, at location approved by site owner. All racks or cabinets to house equipment will be the responsibility of the vendor. To include industry standard grounding and EQ bracing. Provide and install a complete 7/800 Mhz antenna system on existing telecommunication tower or pole in a location approved by site owner/management. Antenna design to be recommended by vendor and approved in advance by ETS. Antenna system to include but not be limited to antenna, mount, coaxial cable, connectors, and cable securing hardware, lightning protection, cable entry hardware. Antennas side mounted must be mounted on 3-foot (or larger) stand-off bracket fitted with a stiff arm. Antenna and cable system sweeps to be conducted and documented following installation. Connect newly installed P25 radio equipment to existing -48VDC power plant with proper circuit breaker protection. Any necessary 120VAC or 240VAC circuits necessary to furnish power to EF Johnson equipment or accessory equipment to be provided by vendor. Installation of ETS provided transmitter combiner/receiver multicoupler equipment, including on-site custom lo-loss coaxial connections to each EF Johnson receiver and transmitter. Vendor to provide complete EF Johnson system site equipment acceptance tuning and alignment including all factory supported documentation. Vendor to integrate all EF Johnson P25 equipment into an ETS provided data circuit and conduct end to end testing of all routers and switched to ensure proper operation and connection to NMS. Complete installation and implementation of P25 radio equipment. All equipment must be functional, and all programming completed. A2. Ohia Mill New 3 channel HIWIN P25 EF Johnson trunk site.