Specifications include, but are not limited to: The work covered by the plans and specifications consists of furnishing all labor, material, supplies, equipment, tools, and incidentals necessary to replace the cooling tower and related plumbing, mechanical, and electrical work at the Case Memorial Library located 176 Tyler City Road. The cooling tower replacement work shall include, but not be limited to: 1. Furnish new BAC (Baltimore Aircoil Company) cooling tower Model # VFL-024-32J. 2. Isolate existing cooling tower electrically and make safe. 3. Isolate water supply and return from tower and drain tower sump and supply and return lines from building. 4. Disconnect tower electrically and remove piping from tower and sump overflow. 5. Using crane remove existing tower from concrete pad and set new cooling tower in place. 6. Re-pipe supply and return condenser water piping and tower sump water supply and overflow. 7. Provide and install new ABB 7.5 hp frequency drive with bypass for tower fan and motor starter for spray pump motor. 8. Rewire new cooling tower. 9. Fill tower, check for leaks, test operation and put new tower in service.