Specifications include, but are not limited to: 1. Remove all existing grass from the corner of the double gate fence going to 12'-15' along the back arc around to 3rd base side back around dugouts and backstop. 2. Remove existing infield mix to a depth of 4" from the new finish grade. Stockpile to haul away. Demo the mound and plate areas as well. Laser grade the subgrade in the infield skin area in preparation for new material. 3. Salvage the existing irrigation and adjusting as necessary. 4. Laser grade all grass areas to match grades and slopes of infield skin and base paths. 5. Import new DuraEdge Rec Infield Mix or equivalent. Laser grade material, compact, hydrate, and work to ensure positive surface drainage.