Repair for EVAPCO Cooling Towers Model: AT-19-514, Serial:593 and 594. Please quote for repairing both cells. 1. Replace fill with new SPX Marley OEM replacement MX75 film fill as originally installed from the factory to include 100% new top fill tubes, fill tube supports and diverters.** 2. Replace the drift eliminators with new SPX Marley OEM replacement TU12 drift eliminators as originally installed from the factory. 3. Clean and coat 100% of the cold-water basin seams with an asphalt extended urethane coating to repair seam leaks and prevent future seam leaks. 4. All hoisting to be provided by contractor. 5. Contractor must provide qualified and certified personnel as needed to perform the work. Provide proof of certification with your response. 6. Materials and Supplies must meet Manufacturer’s specifications. 7. Contractor may not sublet work. 8. All work must be completed by April 12, 2024, to include clean-up.