Specifications include, but are not limited to: City Project 2024-104, Whitney Drive Street and Utility Improvements 60 EA Clear and Grub Tree 3,300 LF Remove Sanitary Sewer (Gravity and Forcemain) 2,560 LF Remove Watermain 285 LF Remove Storm Sewer 5,200 LF Remove Curb and Gutter 26,100 SF Remove Concrete Walk, Driveway, and Valley Gutter 12,800 SY Remove Bituminous Street, Driveway, and Trail Pavement 8 EA Sanitary Sewer Structure 1,600 LF PVC Gravity Sanitary Sewer 1,700 LF Sanitary Sewer Forcemain 700 LF Sanitary Sewer CIPP Lining 35 EA Sanitary Sewer Service 2,550 LF DIP Watermain 200 LF Watermain Pipe Bursting 34 EA Water Service 18 EA Storm Sewer Structure 1,160 LF RCP Storm Sewer 7,200 CY Common Excavation 800 CY Select Granular Borrow 2,700 CY Cl 5 Aggregate Base 2,600 TN Bituminous Mixture 5,200 LF Concrete Curb and Gutter 33,000 SF Concrete Walk and Driveway 4,350 LF Pavement Marking 10,600 SY Sod 40 EA 2” Diameter Tree