Specifications include, but are not limited to: cleaning and televising approximately 4,800 feet of 6"/8” sewers, replacing existing manholes with new precast concrete manholes, performing point repairs to the existing main sewer (via excavation); replacing service laterals; installing cleanouts; lining approximately 4,800 feet of 6"/8” sewer and 58 service laterals with cured-in-place pipe lining (CIPP); rehabilitating approximately 123 vertical feet of manholes using cementitious mortar product, installing manhole frame and covers, and rebuilding bench and inverts; traffic control and pavement restoration; installing soil and erosion control devices; performing complete restoration as required; performing bypass pumping as necessary; and performing all other miscellaneous work required to complete the Project.