Specifications include, but are not limited to: A 10,300 SF interior renovation of the Timothy Edwards Middle School cafeteria and kitchen, including the construction of a new serving enclosure and addition of an exterior walk-in cooler and freezer. The scope of work includes architectural, structural, and MEP disciplines. Base Proposal includes all demolition and construction of all interior and exterior alterations work in all disciplines in the kitchen proper area. To include new exterior walk-in, reconfiguration of the kitchen spaces to include the new serving line that was existing cafeteria space including FF&E as shown in the drawings and specifications. ALT 1 includes demolition and construction of all other interior cafeteria spaces in all disciplines in the cafeteria proper to include removal of the half wall, installation of new entry doors from the hall and FF&E (café tables in this area) as shown in the drawings and specifications. ALT 2 includes all demolition and construction in all disciplines to upgrade the mechanical HVAC system supplying the kitchen areas as shown in the drawings and specifications. ALT 3 includes all demolition and construction in all disciplines to add air-conditioned space to the cafeteria as shown in the drawings and specifications.