Specifications include, but are not limited to: 1. MOBILIZATION – This work consists of operations and prepatory work necessary to become ready to perform the work or an item of work, which includes, but is not limited to Section 00210.40 of the ODOT Standard Specifications. 2. TRAFFIC CONTROL – The Contractor shall furnish materials, personnel, tools, and equipment necessary to provide for traffic control in accordance with the most current edition of the Oregon Temporary Traffic Control Handbook. The Contractor shall provide signs, personnel, tools, and equipment as needed to safely manage traffic through the work zone during construction. 3. CLEARING AND GRUBBING – This work consists of removing and disposing of vegetation and buried matter within the lines of fence installation, or as directed. The work also includes preserving vegetation and objects designated to remain in place and cleanup of the work area. 4. REMOVE EXISTING FENCE – This work consists of removing and disposing of chain link fence to the lines and grades shown or directed. 5. CEDAR FENCE INSTALLATION – This work consists of constructing fences to the lines and grades shown or directed.