Specifications include, but are not limited to: Supply all Design Work for the New Boilers. Provide Permit Drawings and As Built Drawings. Obtain Carson City Building Permit, Carson City Public Works will purchase the permit internally from the Carson City Building Department. Obtain and paying for State of Nevada Boiler Installation / Operating Permit. Drain down, disconnect, remove, and dispose of the two (2) Existing Boilers. Demo and dispose of the boiler piping and boiler flues. Expand Concrete Equipment Pad as necessary. Supply and install Two (2) new Lochinvar Crest FBN1001N High Efficiency Natural Gas Stainless Steel Fire-Tube Commercial Condensing Boilers with Condensate Neutralizer for each boiler. The Boilers shall be anchored directly to the new concrete Pad(s) with seismic brackets that are anchored to the boilers. Supply and install 6” PVC Flue Piping for the New Boilers. Supply and install two (2) circulating pumps (one for each boiler). Supply and install all necessary piping with Isolation Valves, Check Valves, and a Boiler Mag Separator on each Boiler. The boilers shall be piped in primary/secondary fashion. Run Pressure Relief Valve Piping on each boiler to the floor sink. Run drain piping for each boiler to the floor sink. Supply new Motorized Solenoid Valve on the incoming gas piping. Supply all new Natural Gas Piping to each Boiler. Insulate all new piping with Fiberglass Pipe Insulation. Provide Factory Startup and Tuning of the Boilers. Install Pipe Labels on the new Piping. Provide all necessary Electrical work. Provide all necessary Control work (performed by BCS)