Specifications include, but are not limited to: : US26 Overcrossing Bridge Project on the Mt Hood Highway (Rt. No. OR35/US26) near Government Camp. FAP No. S026(168). ($ 1,000,000 - $ 2,000,000). Req. approx. 980 ft2 temp. signs; 4 ea PCMS; 400 hrs flag.; 3 ea flag. sta. light.; 30 ea TCS; 7,600 ft temp. striping; 240 ft temp. trans. rmbl. strips; 976 ft temp. barr.; 2 ea temp. imp. atten.; 1 ea port. traf. sig.; const. surv. wrk.; temp. wrk. acc. & contain.; br. rem. wrk.; 300 yd2 br. appr. slab CPPR; 500 yd2 conc. dk. micromilll.; 500 yd2 deep cut hydrodemo.; 12,700 lb rein.; 40 yd3 dk. conc.; 140 yd2 rein. conc. br. appr. slabs; 33 yd3 SCO mat.; 470 yd2 const. SCO; 610 yd2 saw cut text.; 180 ft elas. conc. nos.; 2.2 yd2 elast. conc. nos. mat.; 48 ft pour. jt. seal; 48 ft precomp. foam sil. jt. seal; 96 ft hot app. jt. seal.; 394 ft curb mt. rl.; 360 lb st. br. str. mt.; 4,800 yd2 CPPR; 580 ton ACP; 100 ft gd. rl.; 0.6 mile rmbl. strips; 4,200 ft thermo. striping. Completion Time: September 30, 2024. Classes of Work: A) Bridges and Structures, or B) the combination of 1) Asphalt Concrete Paving and Oiling & 2) Miscellaneous Highway Appurtenances.