US101: Reedsport Lane Reconfiguration Project on the Oregon Coast Highway (Rt. No. US101) in Reedsport. FAP No. S009(533). ($ 100,000 - $ 500,000). Req. approx. 410 ft2 temp. signs; 2 ea seq. arr. signs; 1 ea PCMS; 1 ea temp. flash. beac.; 30 ft BCD; 10 ton contam. soil disp.; 100 gal contam. grdwtr. rem.; 2 ea soil samp. coll. & test.; const. surv. wrk.; 85 ton aggr. base; 22 ton ACP; 82 ft conc. curbs; 396 ft2 conc. walks; 2 ea curb ramps; 20 ft2 trunc. domes; 24,711 ft thermo. striping; rem. etxg. signs; 60 fbm wd. sign post; 103 ft2 signs; 22 ft sig. sup. drill. shft.; pole found.; lum., lamps, & ball.; switch., cond., & wir.; light. poles & arms; 2 ea traf. sig. mod.; 1 ea flash. beac. install. Completion Time: January 16, 2025. Class of Work: Electrical.