Specifications include, but are not limited to: Prep Work Required Demolition and disposal of floor materials will be completed before contractor begins work. Contractor will be responsible for leveling floors in bedroom 1 and bathroom Relocate electrical and plumbing as required Plumb/wire for owner provided on-demand water heater Remove bedroom closets Remove water heater Contractor will be responsible for the following installations Subfloor leveling materials Replace all flooring Owner provided light fixtures, outlets bath vent fan and switches. Walls and ceiling with open cell foam insulation. Open cell foam R- 20 2.7.3 Classic Ultra = 5.5 Nominal Inches for Ceilings Caulk USA 600 Painters 10.01 OZ for air Filtration Baffle, Corg: 24”OC X 23”LG for Baffles, Vent Cutes Foam Touch n Seal all seasons Polyurethane Foam Sealant 1” for Air Infiltration IBA KN R – 13 KFT 15”X94” 107.71 SF for the exterior walls Walls in bedrooms to be finished with 1x8” pine shiplap and lattice trim (add blocking as required). Shiplap to be sealed with satin polyurethane – stain trim Ceilings (except bathroom) to be finished with 1x8 pine shiplap and lattice trim. Shiplap to be sealed with satin polyurethane – stain trim Place 1x8” pine shiplap on walls and ceiling as accessible in mechanical closet. Window and door casings in bedrooms to receive new 1x3” pine casing – painted or sealed. 1x4 pine base boards to be installed in bedrooms and finished to match other trim. Owner provided pre-fab shower, vanity, fixtures, trim and toilet. Venting, bathroom ceiling and upper half of walls to receive ½” sheetrock – painted 2 coats ceiling white Owner provided lower half of bath walls, and bath floor to have ceramic tile. Interior doors (5) to be replaced with 2 panel knotty pine units and finished with polyurethane New interior doors to receive oil rubbed bronze hardware and hinges General Requirements All work will be completed in such a way as to protect existing architectural features from damage. Protect all adjacent architectural features including but not limited to window glass, brick, unpainted roof framing, hardware, etc. removal or alteration features other than those listed in these specifications must be approved in advance by the SCPRT Procurement and Park Staff.