Specifications include, but are not limited to: Site Preparation: Pads will be constructed from offsite clay gravel. On site material may be used if approved by the HACN inspector. This will be a site-by-site decision. We would prefer that you haul it in. Pads must be constructed to 50’ x 70’deminsions, pads must be inspected and approved by the HACN Inspector before footings are dug. No exceptions. All trees and construction debris must be removed from the HACN acreage prior to construction of the home. This includes any debris, material structures disturbed during clearing and building of the pad and for septic drain field. CONTRACTOR WILL BE RESPONSIBLE FOR ALL CLEARING. NO CHANGE ORDER WILL BE ACCEPTED FOR CLEARING OF TREES AND CONSTRUCTION OF HOUSE PAD. Any tin horns needed for construction of driveway shall be minimum 20’ in length. If driveway is from a main (state) highway contact inspector for requirements. Driveways shall have a 6” to 8” cut to remove topsoil. Driveway shall have 6” to 8” clay gravel base with 4” of gray crusher run limestone gravel topping. Driveways will be built from the site to the county road/city street. If located in the city should verify city requirements and bid accordingly. Contractor will be responsible for up to 400’ of the driveway. Contractor will be responsible for final grade of the yard for preparations for sod installation in a 30’ perimeter around house. Final grade material to be topsoil free of large rocks, trash and tree roots and any debris. Topsoil material must be approved by HACN. Contractor responsible for installing Bermuda mix sod in the 30’ perimeter around the home. Utilities: Contractor will be responsible for getting utilities to the site electric, water and sewer. Contractor will be responsible for getting the perc test done. . Pad: Pre-Treat slab, footing for wood infestation insects. Spray perimeter around brick after fresh sod is laid and before sod is installed. (see spec book for requirements SECTION 2D) Proof of application must be posted at the site. ORIGINAL termite certificate required from applicator AND SUBMITTED WITH 1ST DRAW REQUEST. An amended Termite Certificate will be required to be submitted with the FINAL draw request...