Specifications include, but are not limited to: Bid Item No. 1 –Sidewalk, PCC, 4” This item shall include all labor, materials and equipment necessary to construct 4-inch thick sidewalk in accordance with SUDAS Specification Section 7030 and these special provisions. This item shall include all normal work associated with constructing sidewalk. Sidewalks constructed in certain areas such as downtown may be required to exhibit a “picture frame” finish; such a finish shall be an incidental cost to this item. If sidewalks are constructed directly behind the curb as in downtown areas, and signs need to be reinstalled, the contractor shall appropriately sleeve the area in accordance with the instructions of the City Traffic Engineer. Any sleeves necessary will NOT be supplied by the City, and the contractor shall be responsible for installing them as an incidental cost to sidewalk construction. The contractor will not be allowed to core the area in lieu of using a sleeve. The adjustment of utility shutoff boxes, gas boxes, water valves and electrical hand holes shall be considered an incidental cost to this item