Specifications include, but are not limited to: The Cherokee Nation (Nation) will provide: 1. The Nation will provide land for the towers. 2. The Nation will provide each tower with a fiber optic network connection. 3. The Nation will provide local permits to build the tower. 4. The Nation will obtain FRN numbers from the FCC and notify the FCC of tower construction. 5. The Nation will file FAA form 7460-1 to obtain a No Hazard Determination. 6. The Nation will be responsible for the environmental applications for all tower sites. The qualified firm (The Firm) will provide: 1. The galvanized steel tower sections. 2. The labor to construct the tower. 3. The Safe Climbing System for each tower. 4. All brackets and fixtures to attach the antennae required for up to 3 commercial carrier systems and one private LTE system. 5. Ground Clearing at the tower sites. 6. Soil testing for each location. 7. Shelter (10x20 Ft) for each tower site. 8. Uninterruptible power supply capable of 15 minutes at full load. 9. Transfer switch to go from Commercial A/C to generator and back. 10. Generator with the capacity (at least 50 Kw) to support all the above-listed systems per tower. 11. Fuel Tank with capacity to power generator for 72 hours per tower. 12. A 7-foot-high fence around the tower site with lockable access doors. 13. Electrical connections that can produce at least 50 Kw per tower. 14. Roads to access tower location if needed. 15. Testing all towers, including physical inspections, ground testing, security fencing, electrical connections, and generator operation. 16. Site security plan, including 24/7 monitoring of each site and interface to NOC systems. 17. Create As-Builts of all tower sites, including shelters, generators, fuel tanks and fencing. 18. An Ice bridge between the shelters and towers. 19. Restoration and cleaning of the tower site and adjacent areas, including replacing native foliage around tower foundations.