Contractor shall furnish labor and material to perform the following work: 1. Remove and dispose two (2) sewage ejector pumps, including motors, impellers, electrical disconnect switches and all related mechanical and electrical accessories; remove, dispose all the debris in the sump and clean the sump completely; 2. Disconnect, remove and dispose existing temporary sewer pipe from the main sewer pipe and re-connect existing sewer pipe to the main sewer pipe; 3. Install two (2) sewage ejector pumps, (see specification below), including motors, impellers, electrical disconnect switches and all related mechanical and electrical accessories; 4. After replacement and all necessary or related accessories, performs testing, adjusting and start-up and put the new sewage ejector pumps into a safe and efficient operation.