The extent of work on this project includes all materials, equipment, transportation, and labor necessary to complete the improvement generally described as follows: RCB culvert reconstruction, roadway reconstruction, and sidewalk reconstruction, as well as surface and channel grading and restoration along West Clinton Avenue. The project includes approximately 288 SY of PCC pavement, 46 SY of PCC sidewalk, 11 LF of RCP storm sewer, 207 LF of PVC subdrain, 2 fire hydrants, remove 1 valve and 30 LF of water main, 97 LF of 42” chain-link fence, 368 TON revetment, 1,442 SF of Flexamat, 126 CY of structural concrete as part of a 10’ x 5’ to 6’ x 5’ RCBC with slope tapered inlet, and miscellaneous associated work, including cleanup.