Specifications include, but are not limited to: The project is located in the City of Ely, IA, along the entirety of Traer Street and Main Street from Traer Street to Dows Street. The work for which bids are asked generally includes the following: Project will replace and abandon existing 4-inch water main with approximately 215 LF of 6-inch and 1,320 LF of 10-inch C900 PVC water main and 158LF of 10-inch ductile iron water main. Project will replace and remove existing sanitary sewer with 508 LF of 8-inch PVC sanitary sewer and construct 200 LF of 4-inch PVC sanitary sewer. The existing disturbed roadway surface will be replaced with approximately 1,255 SY of 8-inch PCC pavement and 5,730 SY of 6-inch HMA pavement along with curb & gutter, sidewalks, and crosswalk pavers. Project will replace and remove the existing storm sewer with approximately 2,483 LF of RCP storm sewer of varying sizes. The work under the contract shall commence upon receipt of the signed contract, performance and payment bonds, insurance certificate, and issuance of the notice to proceed. The project Substantial Completion Date is October 1, 2024. The project Final Completion Date is November 1, 2024. The Iowa Statewide Urban Design and Specifications (SUDAS), 2023 Edition, shall apply to this project, they are available online at: HTTPS://IOWASUDAS.ORG Modifications to SUDAS are noted in the Project Plans Estimate Reference Information Table and herein (Project Manual).