Specifications include, but are not limited to: installation of approximately 520 feet of new 5-foot wide concrete sidewalk and approximately 490 feet of 15” smooth wall pipe, and 40 feet of 18” smooth wall pipe, as well as five type 16 catch basins and one type 18 catch basin on Northside Drive. The specific project location on Northside Drive is from just south of North Forest Drive near 7555 Northside Drive to a location near 7477 Northside Drive where it will connect to an existing sidewalk. The work shall also include, but is not limited to, the relocation of approximately 285 feet of 8-inch Ductile Iron Pipe (DIP) Water Main owned by Charleston Water System, milling & repaving asphalt roadway, milling and repaving asphalt & concrete driveways, road striping, video pipe inspection of drainage for both phases of the project, as well as erosion and sediment control and traffic control. This project is the second phase of the Northside Drive sidewalk project, phase one of the project was completed by others. The project on Northwoods Boulevard shall consist of the construction of approximately 2,900 linear feet of new 5-foot-wide sidewalk along Northwoods Boulevard. It will connect to existing sidewalks on Ashely Phosphate Road and Northwoods Boulevard near Rivers Avenue. The work shall include, but is not limited to, earthwork, traffic control, concrete curb and gutter, concrete sidewalk, pedestrian ramps, removal of existing pavement, small quantities of drainage pipe (smooth wall), a catch basin, a concrete median modification, and crosswalk markings. The approximate total project length is 3,700 linear feet.