Specifications include, but are not limited to: Work involves installing footings, posts and removing and erecting signs on I-35 for the Intermodal Facility and Logistics Park in Johnson County. Add signing on I-35 in advance of Exit 205 for Homestead Lane and on I-35 southbound in advance of Exit 207 for Gardner Rd. Sign installations are on southbound and northbound I-35 at various locations. Installation is for the following signs: see attached plans sheets for location details: Site 1/I-35 Northbound (Exit 205) E3-1 (Intermodal Facility & Logistics Park KC Via Homestead Lane) sign with E1-5 (205) exit number sign to be located 1,000’ north of the E1-3 (Homestead Lane_1 ¼ Miles) sign. The E3-1 sign is to be installed on two (2) W10x22 (A36) or two (2) W10x12 (A572). The E1-5 sign is installed above the E3-1 sign with three (3) aluminum beams