Specifications include, but are not limited to: MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS TRAFFIC CONTROL 1.000 LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT 2,505.000 SY REMOVAL & DISPOSAL OF EXISTING CURB 850.000 LF BORROW EXCAVATION 354.000 CY EXCAVATION FOR SHOULDER PAVING 186.912 STA HAULING OF EXCAVATED SHOULDER MATERIAL 186.912 STA MAINTENANCE STONE 206.000 TON HMA SHOULDER WIDENING COURSE 2,492.160 TON LIQUID ASPHALT BINDER PG64-22 2,323.330 TON FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 4,000.000 SY FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 16,600.000 SY MILLING EXISTING ASPHALT PAVEMENT 2.0" 355,306.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 4,595.000 SY MILLED-IN RUMBLE STRIP 18.770 MI HOT MIX ASPHALT SURFACE COURSE TYPE B 38,775.760 TON HOT MIX ASPHALT SURFACE COURSE TYPE D 190.000 TON DRIVEWAY PAVING-SURFACE TYPE D 826.250 TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,920.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 87,870.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 269,286.000 LF 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 4,350.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 3,975.000 LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 60.000 EA WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 60.000 EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 50,940.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 386,187.000 LF 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 770.000 LF 24" YELLOW DIAGONAL LINES - FAST DRY PAINT 570.000 LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 28,640.000 LF 6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 650.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 71,070.000 LF