Specifications include, but are not limited to: MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS TRAFFIC CONTROL 1.000 LS RAILROAD INSURANCE AND FLAGGING 001 1.000 LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT 450.000 SY BORROW EXCAVATION 654.000 CY EXCAVATION FOR SHOULDER PAVING 19.900 STA HAULING OF EXCAVATED SHOULDER MATERIAL 19.900 STA MAINTENANCE STONE 44.600 TON HMA SHOULDER WIDENING COURSE 100.000 TON LIQUID ASPHALT BINDER PG64-22 491.294 TON FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 1,250.000 SY FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,660.000 SY FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,550.000 SY MILLING EXISTING ASPHALT PAVEMENT 1.5" 7,515.000 SY MILLING EXISTING ASPHALT PAVEMENT 1.75" 20,267.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,650.000 SY HOT MIX ASPHALT SURFACE COURSE TYPE C 3,820.220 TON HOT MIX ASPHALT SURFACE COURSE TYPE D 3,252.956 TON DRIVEWAY PAVING-SURFACE TYPE C 288.625 TON DRIVEWAY PAVING-SURFACE TYPE D 246.000 TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,254.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 540.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 93,360.000 LF 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 3,270.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 2,700.000 LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 12.000 EA WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 12.000 EA RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 6.000 EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2,100.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 100,560.000 LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 180.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 31,120.000 LF