Specifications include, but are not limited to: MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS TRAFFIC CONTROL 1.000 LS SELECTED CLEARING & GRUBBING 1.000 LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT 300.000 SY UNCLASSIFIED EXCAVATION 11,375.000 CY ROCK EXCAVATION 60.000 CY BORROW EXCAVATION 1,400.000 CY STATION GRADING 73.914 STA MAINTENANCE STONE 105.000 TON HOT MIX ASPHALT BASE COURSE - TYPE B 36,339.890 TON LIQUID ASPHALT BINDER PG64-22 2,261.755 TON MILLING EXISTING ASPHALT PAVEMENT 4.0" 71,281.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 8,185.000 SY MILLED-IN RUMBLE STRIP 10.740 MI HOT MIX ASPHALT SURFACE COURSE TYPE B 10,017.920 TON HOT MIX ASPHALT SURFACE COURSE TYPE C 735.000 TON DRIVEWAY PAVING-SURFACE TYPE C 463.000 TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,020.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 925.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 131,156.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,822.000 LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4,300.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 111,215.000 LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 925.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 65,788.000 LF 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 72.000 LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 904.000 LF 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4,300.000 LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 45,637.000 LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 425.000 EA FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 10.000 LF FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 300.000 LF