Specifications include, but are not limited to: The Work consists of the following: New Construction - 1. NMSU Agricultural Modernization Phase II: ACES-SLC at approximately 38,280 sf. The building to be located on NMSU’s main campus in Las Cruces New Mexico on Knox Street South of the Food Science Building. 2. Loading Dock to support the Food Science Building and ACES-SLC will be constructed first and consists of new fencing to tie into existing fencing, loading dock to support semi trucks and an animal loading ramp to support trailer drop off. 3. Building includes Prefabricated Metal Building, Structural, Building Controls, IT, AV, Security, Mechanical, Electrical, and Plumbing Systems. 4. Communal Restrooms and Classroom are in adjoining CMU buildings with metal joist roof structure. 5. Sitework/Landscaping including the support of semitruck access and truck with trailer access to the building, animal access from adjacent site pens to the south and west and addressing of drainage from and across site. Demolition - 1. Demolition of site pen fencing, site concrete and pen shade structures.