Specifications include, but are not limited to: MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS TRAFFIC CONTROL 1.000 LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT 6,375.000 SY REMOVAL & DISPOSAL OF EXISTING CURB 985.000 LF BORROW EXCAVATION 1,768.000 CY MAINTENANCE STONE 55.000 TON LIQUID ASPHALT BINDER PG64-22 1,558.720 TON ARAMID FIBER 12,409.120 LB FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 5,000.000 SY FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 500.000 SY MILLING EXISTING ASPHALT PAVEMENT 2.0" 109,611.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 980.000 SY MILLED-IN RUMBLE STRIP 19.520 MI HOT MIX ASPHALT SURFACE COURSE TYPE B 27,287.653 TON HOT MIX ASPHALT SURFACE COURSE TYPE D 237.000 TON DRIVEWAY PAVING-SURFACE TYPE D 653.750 TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,160.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 23,985.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 276,630.000 LF 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 9,255.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 5,265.000 LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 45.000 EA WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 12.000 EA WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 12.000 EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 28,530.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 257,970.000 LF 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 1,660.000 LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 7,995.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 92,210.000 LF 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 3,085.000 LF 12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 115.000 LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,755.000 LF