Specifications include, but are not limited to: Mechanical System Systems to be Commissioned: Existing Air Handlers serving project area, 100% tested. VAV boxes with reheat, 20% with a minimum of 5. Fan powered VAV boxes, 20% with a minimum of 5. Unit heater, 100% tested. Domestic Water Heater, 100% tested. Commissioning Process During the Construction Phase The Commissioning Process activities accomplished by the Commissioning Authority during the Construction Phase include: • Organizes the Commissioning Process components and conducts a pre-bid and preconstruction meeting where the Commissioning Process requirements are reviewed with the Commissioning Team. • Review pre-construction TAB and note any discrepancies from expected results. • HVAC system functional testing and sequence verification for the systems to be commissioned with testing rates noted. Verify system components are wired and mapped to the building automation system correctly and verify all system components are controlled to accomplish the intent of the control sequences. Testing shall include but not be limited to: - Point to point verification of all HVAC component operations - Verification of sequences of control - Alarm verification