Specifications include, but are not limited to: The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: 40 EACH Clearing and Grubbing; 20,000 S Y Remove Bituminous Pavement (All Types); 1,860 S Y Remove Concrete Pavement (All Types); 5,800 C Y Excavation – Common (P); 4,700 C Y Aggregate Base Class 5; 5,000 TON Bituminous Paving (All Types); 92,800 S F Concrete Walk, Driveway, and Boulevard; 9,100 L F Concrete Curb and Gutter; 100 EACH Boulevard Trees with Planters; .7 ACRE Seeding; 1 L S Lighting (Including Fixtures, Wiring, Conduit, and Appurtenances); 400 L F 6” PVC Sanitary Sewer (New Services); 500 L F 6” DIP Watermain (New Services); 2,750 L F 12” – 24” RCP Storm Sewer; 2 EACH Drainage Structures Design Special (SAFL BAFL); 11,980 L F Pavement Markings (Linear); 1 LS Streetscaping (Monument Signs, Benches, Planters); 150 L F Furnish and Install Signs 1 LS Boulevard Irrigation