The Work shall consist of all labor, equipment, fees, permits, and other related costs necessary to provide for construction of new Continuous Emission Monitoring System (CEMS) room; new HVAC system for current and new CEMS rooms; new CEMS for three incinerators including rack/cabinet and miscellaneous components; removal and replacement of HVAC system and controls in Sludge Processing Building; removal and replacement of coating system on incinerator interior stack/duct work; hazardous building material abatement and removal; modifications to existing incinerator stack supports; safety railing improvements on the Sludge Processing Building roof; electrical improvements associated with the new CEMS room, CEMS, and HVAC equipment along with support equipment and accessories as shown and specified. Bidders are directed to Section 01010F Summary of Work for specific details